Works Performed

Ground Excavation Backfilling Works: 27.250 m3
Monolithic and Prefabricated Reinforced Concrete Structure Construction: 1.500 m3
Pipe Installation: 17.500 WDI
Steel Erection: 1.200 TON
Equipment Installation: 500 TON
Electrical and Instrumentation Installation: 80.000 m
Workshop Sandblasting and Painting: 2.500 m2
Insulation: 3.750 m2
Scaffolding Assembly/Dismantling: 10.000 m2
 

Project Description

Construction of mechanical and civil works within the scope of Amur Gas Chemical Complex Project.
 

Total Number of Personnel

300