Works Performed

Piping Works: 118900 WDI
Trace Installation Works: 14600 m
Steel Installation Works: 2980 tons
Trapezoidal Sheet Installation Works: 2354 m²
Painting Works: 83000 m²
Insulation Works: 58800 m²
Electrical Works: 48100 m
Electrical Works: 411 pcs.
Tank Spring Works: 300 m
Sandblasting Works: 6820 m

Project Description

AGPP will be one of the largest gas processing plants in the world with a feed gas capacity of 42 billion cubic meters of natural gas per year, and will be an essential part of Gazprom’s strategic plan to supply Russian natural gas to China. The AGPP Complex will be only the first milestone of a large industrial development, that will include significant investments of the Russian Federation in downstream petrochemicals to be fed with products associated to natural gas of AGPP.
 

Total Number of Personnel

2250