Works Performed

Pipe Installation: 20,000 WDI
Equipment Installation: 450 Tons
Sand Blasting, Painting, All Line Paint Maintenance and Repair
 

Project Description

Three main functions of the LNG terminal, which has a 37 million Sm³ /day gasification capacity and 3 storage tankers (85.000 m³ capacity for each), are: The Storage of the imported LNG, the dispatching of the regasified LNG Russian Federation- Türkiye Natural Gas Pipeline at required volumes and loading LNG to trucks.
 

Total Number of Personnel

107